Platform

Migration & evaluation

Prove Basalt beside your incumbent on real workloads, with the rollback story written down before anything moves. The person proposing this is putting their own credibility on the line: every step here has a named exit. There is no easy migration off an incumbent this deeply embedded, and this page does not claim one. Basalt accounts for that work and is built to support it, so you are not doing it alone.

How this actually goes

Stand up alongside what you already run

Basalt stands up next to what you already run. You validate it side by side before anything real depends on it, then migrate in stages: never a single cutover, and never production first.

  1. 01Assess what you runweeks 1–3

    Count what you run, where it runs, and what the renewal covers. The output is a number finance can use.

  2. 02Validate in a controlled environmentweeks 3–8

    Real workloads, beside the incumbent, with the rollback agreed in advance.

  3. 03Expand in measured wavesby site class

    Disconnected endpoints and edge sites first, consolidation next, core last.

  4. 04The way backdocumented per wave

    Every wave has its own exit, written before it starts.

Two ways to get started

Run the numbers, then try the platform

Run the numbers with your own infrastructure, then put Basalt beside your incumbent in a controlled environment, with a rollback story written down before anything moves.

Run the numbersPlan a controlled evaluation